Friday, February 26, 2010

Lights...

Well, just the fixtures. No power here after the storm.

Un peu de pluie!

Il a plu beaucoup hier et le sol est encore gele. Donc l'eau est monte...

Wednesday, February 24, 2010

StoneCraft worshop

Our kitchen counter top is being made today at Stonecraft.
It will cure for a week and installed in a couple of weeks.
This is the molds...

Gaz tank

Dead River is installing 2 propane tanks for heat and stove.

Painting and plumbing

Monday, February 22, 2010

Garage doors are installed now

RG Tombs installed our garage doors. They are passive solar doors.

Sunday, February 21, 2010

Bathroom







tiling of vanity. Patricia spent the day tiling the vanity tops. She used a sticky paper to glue the tiles to the top. A new product that seems to work well, and fore that made her life easier.






Patricia a passé la journée á carreler les dessus des meubles de salle de bain. Elle a collé les carreaux avec un papier adhesif, un nouveau produit qui a l'air de bien marcher et en tout cas, á faciliter la pose.



Saturday, February 20, 2010

Cuisine

Kitchen... done

Thursday, February 18, 2010

Job site moments

A few days ago, we had little helpers visiting us on the job site. Thank you Loic pour le chocalat. Il y a quelques semaines, nous avons eu des petits visiteurs qui sont venus nous soutenir avec du chocolat...
Get back to work, fainéants!

Secret door...

Where it's going? Can't tell you, it's a secret!
Une porte secrete... Ou mene t'elle? C'est une secret!

Man in the mirror

Our bathroom is also getting finished. The mirrors were installed this morning.
Notre salle de bain est presque finie aussi. Les mirroirs sont installes.

Concrete countertop

Scott from StoneCraft is taking measurement today to prepare a template. They will do a mold of the countertop. The countertop will be in concrete. It will take them 2 to 3 weeks to get it installed. Still need to pick the color though. We think we'll go for white concrete.

Scott de StoneCraft prend les mesures et va preparer un modéle pour faire notre comptoir en ciment. Il nous faut encore choisir la couleur. Sûrement un dessus de cuisine en ciment blanc...

Wednesday, February 17, 2010

Dardano in action

The master builder is finishing the kitchen

Outside view




Allo? Ikea?

We were missing a couple of cabinets (ok, one was missing and the other one, we ordered the wrong size)... We called Ikea. Jennifer was very helpful and prepared the order for us. Monday, we drove to Ikea Boston/Stoughton. And they are now installed. We are meeting with Kevin from StoneCraft on Thursday for a concrete countertop. Interesting...
Il nous manquait 2 meubles de cuisine (un manqué, l'autre, on s'est trompé dans les mesures). Nous avons appelé Ikea et lundi nous sommes allés les chercher. Ils sont dejá montés. Demain jeudi, nous avons rendez-vous avec Kevin de StoneCraft pour prendre les mesures pour le dessus de comptoir en ciment... ça va être interessant.

Saturday, February 13, 2010

Another Ikea Week-End




Kitchen weekend #2... Thank you John and Steve for your help.


Tile work is also being finished.


Weekend Cuisine Numero 2. (pas de gréve Ikea ici, je vous le dis...).


Le carrelage se termine aussi.


Wednesday, February 10, 2010

Vue d'ensemble

View from the East and the West...

Vue d'un coté et de l'autre...

floor and tiles

The tiling is taking a little longer than expected but it's coming along.
The flooring is actually ahead of schedule. The hardwood floor is Lyptus.



Sunday, February 7, 2010

Saturday, February 6, 2010

Ikea kitchen - day 1

Most of the kitchen cabinets are built. Huge progress. Of course we are missing 3 panets and 2 cabinets. Lost in the Ikea stratosphere...
La plupart des meubles sont montes. Mais il nous manque 3 paneaux et 2 meubles. Perdu dans le monde magique de Ikea. Il va falloir les commander.
Merci David, Isabelle et Celine pour votre aide and Justene too.

Ikea anyone?

Any interest in putting together a huge Swedish puzzle?
On commence a monter la cuisine...

Carrelage

Tiling now.

Wednesday, February 3, 2010

Electric dream

CMP finally put the power and now they are coming back to secure the electric pole. We put the power line underground. They are installing an anchor that will go 6ft in the ground and that will support the pole.

Le conduit d'electricité passe sous terre du dernier poteau á la maison. Ils ont installé aujourd'hui un point d'ancrage pour soutenir le poteau.

Monday, February 1, 2010

tour

un petit tour...

Floor

Jim and Tim are installing the flooring.