Emery Pelletier from C&E Earthworks (207-615 1802) in Falmouth, ME worked on the excavation for the garage and organized the concrete work. Excellent work! He is also in charge of the septic system that will be installed in the back.
The design for the septic was done by Brady from Frick & Associates in Gorham, ME. Very clever and very nice to work with him.
No comments:
Post a Comment